ACT-8

Edmonton International Airport

Edmonton, AB, Canada, 2012

The ACT-8 and FRSM-20K platforms were used for the realization of metal cladding work on a new terminal. The architectural design of the building with its curved shapes and variable size windows, in addition to the impossibility of anchoring itself to certain floors and concrete slabs, were challenges that required unusual solutions.