Centrales thermiques

/images/etude-de-cas/johns-river-power/Power plants
Jacksonville, FL, USA, 2011

ACT-8

St. Johns River Power Park cooling towers

Fraco has been approched by Structural to propose a solution allowing workers to access a 458' high hyperbolic structure. Works to be completed consisted in rebar replacement, concrete repair and cathodic protection. Twelve Fraco ACT-8 electric units were equipped with self-levelling devices were installed and tied-in without damaging existing rebar.