Infrastructures

If necessary, we adapt our equipment to your project or even develop new products. There is no such word as "can't".

Bridges

Pitt Meadows, BC, Canada, 2010

ACT-8

Pitt River Bridge

Twelve ACT-8 work platforms were used for the construction of a cable-stayed bridge in the Vancouver area. For this project, Fraco has developed front extensions that allowed access to the sides of each pillar.

Read the case study

Interchanges

Montreal, QC, Canada, 2010

ACT-8

St.Pierre interchange

Fraco's expertise has facilitated the repair of support piles for a highway interchange in the Montreal area. The work platforms provided both access and a comfortable and safe environment for the repairing workforce.

Read the case study